GE Aerospace GE90
165 US-registered aircraft fly this program — 330 installed engines across 4 registry codes
Program snapshot(US registry)
4 registry engine codes aggregated
No meaningful US teardown supply yet — 165 aircraft flying, median build year ≈2015; the retirement curve is the thing to watch.
FAA registry data, US-registered aircraft only. Deregs = domestic deregistrations — a teardown proxy that also captures re-registrations and some unflagged exports, never a confirmed part-out count. Median build year is a tails-weighted median of per-variant medians (≈). 1 of 165 active tails are registered under generic series codes rather than a specific variant, so per-variant splits are partial.
Registry codes under this program
FAA registry — as registered, variants + generic series rows
| Engine model | Active tails | Engine units | Median build yr | Deregs since ’23 | Exported | Avg age at dereg |
|---|---|---|---|---|---|---|
| GE90-110B1 | 90 | 180 | 2015 | 0 | 5 | 9 yr |
| GE90-115B | 51 | 102 | 2015 | 1 | 2 | 18.7 yr |
| GE90-90B | 23 | 46 | 1999 | 0 | 0 | — |
| GE90 seriesgeneric code | 1 | 2 | 2005 | 0 | 0 | — |
Counts reflect the engine model exactly as registered. Registry-wide, roughly 57% of engine records name a specific variant; the rest carry generic series codes, so generic rows coexist with variant rows and per-variant figures are partial. Deregs = domestic deregistrations (a teardown proxy, not confirmed part-outs); exported aircraft left the US fleet intact.
Airframe applications
FAA registry + BTS T-100 family rollups
| Family | Tails on this program | Family US fleet | Avg fleet age | Built 15+ yrs ago | Avg cycles / yr |
|---|---|---|---|---|---|
| 777 | 107 | 288 | 21.1 yr | 170 | 383 |
“Tails on this program” counts US-registered aircraft the registry rollup maps to both the family and a GE90 engine code — an undercount, since not every tail resolves to a family. Family fleet, age, and cycles columns describe the WHOLE family across every engine option, not just GE90-powered aircraft (cycles from BTS T-100, 2025).
Airworthiness Directive activity
FAA / EASA public regulatory data
- FAA AD 2025-25-07effective Feb 6, 2026Mixed actions
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) Model GE90-90B, GE90-94B, GE90- 110B1, and GE90-115B engines. This AD was prompted by a manufacturer investigation that revealed certain high-pressure turbine (HPT) stage 1 and HPT stage 2 disks were manufactured from powder metal material suspected to contain iron inclusion. This AD requires replacement of affected HPT stage 1 and HPT stage 2 disks with parts eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.
- FAA AD 2025-07-10effective May 21, 2025Prohibition
The FAA is superseding Airworthiness Directive (AD) 2020-20-17 and AD 2021-15-05 for all General Electric Company (GE) Model GE90- 110B1 and GE90-115B engines. AD 2020-20-17 prohibits dispatch of an airplane if certain status messages are displayed on the engine indicating and crew alerting system (EICAS) and if certain conditions are present; and as terminating action, requires revision of the existing FAA-approved minimum equipment list (MEL) by incorporating the dispatch restrictions into the MEL. AD 2021-15-05 requires initial and repetitive replacement of the full authority digital engine control (FADEC) integrated circuit (MN4) microprocessor. Since the FAA issued AD 2020-20-17 and AD 2021-15-05, the manufacturer has developed a software revision for the electronic engine control (EEC) FADEC that further mitigates the unsafe condition. This AD retains all the actions of AD 2020-20-17 and AD 2021-15-05, and also requires upgrading the EEC FADEC software to an EEC FADEC software version eligible for installation as a terminating action. The FAA is issuing this AD to address the unsafe condition on these products.
- FAA AD 2024-06-15effective May 14, 2024Prohibition
The FAA is correcting an airworthiness directive (AD) that published in the Federal Register. That AD applies to certain General Electric Company (GE) Model GE90-110B1 and GE90-115B engines. As published, references to the service information include a typographical error in the regulatory text of the AD. This document corrects that error in all references. In all other respects, the original document remains the same.
- FAA AD 2023-26-07effective Feb 27, 2024Mixed actions
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) Model GE90-90B, GE90-94B, GE90- 110B1, and GE90-115B engines. This AD was prompted by a manufacturer investigation that revealed certain high-pressure turbine (HPT) stage 1 disks, HPT stage 2 disks, forward HPT rotor seals, interstage HPT seals, and stages 7-9 compressor rotor spools were manufactured from powder metal material suspected to contain iron inclusion. This AD requires replacement of affected HPT stage 1 disks, HPT stage 2 disks, forward HPT rotor seals, interstage HPT seals, and stages 7-9 compressor rotor spools. The FAA is issuing this AD to address the unsafe condition on these products.
- FAA AD 2023-05-17effective May 10, 2023Mixed actions
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high- pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This AD requires initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with parts eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this AD requires replacing the HPT stage 2 nozzles. The FAA is issuing this AD to address the unsafe condition on these products.
Directives in the FAA / EASA corpus we have processed whose text names GE90 engine models — not a complete historical AD list, and text matching can include airframe directives that reference the engine. An AD is a compliance requirement that drives scheduled work on a regulator's clock — a regulatory compliance signal, not a failure prediction, and no comment on this engine's reliability.